{"id":1191,"date":"2026-06-28T12:59:16","date_gmt":"2026-06-28T10:59:16","guid":{"rendered":"https:\/\/metaling-jajce.com\/referenca\/m4-metro-copenhagen\/"},"modified":"2026-07-08T23:10:23","modified_gmt":"2026-07-08T21:10:23","slug":"m4-metro-copenhagen","status":"publish","type":"referenca","link":"https:\/\/metaling-jajce.com\/en\/references\/m4-metro-copenhagen\/","title":{"rendered":"M4 Metro Copenhagen"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Over 4,500 tons of steel structures were delivered and assembled for the M4 Metro Copenhagen project, including tunnel beams and station structures, manufactured to DS\/EN 1090-2 EXC4 standard. In addition to assembly, numerous works were carried out \u2014 from TBM launch and operation systems to permanent installations such as platform screen doors, escalator landings, and external gratings.<\/p>\n","protected":false},"featured_media":1194,"template":"","meta":{"_acf_changed":false},"class_list":["post-1191","referenca","type-referenca","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/metaling-jajce.com\/en\/wp-json\/wp\/v2\/referenca\/1191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metaling-jajce.com\/en\/wp-json\/wp\/v2\/referenca"}],"about":[{"href":"https:\/\/metaling-jajce.com\/en\/wp-json\/wp\/v2\/types\/referenca"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metaling-jajce.com\/en\/wp-json\/wp\/v2\/media\/1194"}],"wp:attachment":[{"href":"https:\/\/metaling-jajce.com\/en\/wp-json\/wp\/v2\/media?parent=1191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}